Projects & Case Studies
Our Success Stories
Explore our portfolio of successful projects across the Middle East and India. Each project demonstrates our commitment to zero downtime, safety, and operational excellence.

Saudi Petrochemical Plant Hot Tapping
Challenge
Required new branch connection on live 24-inch pipeline operating at 800 psig without shutdown.
Solution
Executed precision hot tapping operation using specialized equipment, maintaining full operational capacity throughout the process.
Results
- Zero downtime achieved
- Completed in 48 hours
- 100% safety compliance
- Cost savings of $2.5M in avoided shutdown

Qatar Gas Pipeline Freezing Project
Challenge
Needed to replace critical valve in 12-inch natural gas line without system shutdown.
Solution
Applied advanced pipe freezing technology using liquid nitrogen to create ice plug, enabling safe valve replacement.
Results
- No production interruption
- Completed in 36 hours
- Zero safety incidents
- Maintained gas supply continuity

Bahrain Refinery Line Stopping
Challenge
Emergency repair needed on 16-inch crude oil pipeline while maintaining refinery operations.
Solution
Deployed mechanical plugging system with bypass piping to isolate section for repairs.
Results
- Refinery operations continued
- Emergency repair completed
- Environmental impact minimized
- System restored in 72 hours

Indian Oil Corporation In-Service Welding
Challenge
Pipeline modification required on live natural gas transmission line.
Solution
Performed certified 6G position welding on pressurized pipeline using specialized techniques.
Results
- Welding completed without shutdown
- 100% weld quality certification
- No leaks or defects
- Project completed ahead of schedule

Kuwait Water Treatment Leak Sealing
Challenge
Multiple leaks detected in water distribution system requiring immediate attention.
Solution
Applied online leak sealing technology to repair leaks while system remained operational.
Results
- All leaks sealed successfully
- Water supply maintained
- Zero service interruption
- Cost-effective solution delivered

Oman LNG Bolt Torquing Project
Challenge
Critical flange connections required precise torque application on 48-inch pipeline.
Solution
Utilized hydraulic tensioning system for accurate and uniform bolt tensioning.
Results
- Precise torque achieved
- Uniform tension across all bolts
- Enhanced safety standards
- Long-term reliability ensured